They're here.
![]()
Looks like the solar panels were designed in Germany.
9:30 south slope: ![]()
9:30 west slope:![]()
9:30 north wall, the PowerWall is behind the orange ladder:![]()
10:45 south slope![]()
10:45 west slope![]()
10:45 north wall
12:00 south slope
12:00 west slope![]()
12:00 north wall![]()
![]()
2:00 south slope - Panel installers finished and left.![]()
2:00 west slope![]()
2:00 north wall. CenterPoint (manages grid) is onsite, they had to pull the meter for the electricians.![]()
![]()
4:20 south slope - I drug a ladder out so I could get a better photo of the south roof, was up against my neighbor's house for this shot. The original plan called for 6 rows with some gaps for vent pipes over the master bath. They were able to work around those and clean up the arrangement.![]()
![]()
4:20 north wall - Electricians are finished, new sticker on the meter lets power company linemen know there's other sources of power besides the grid.![]()
![]()
![]()
Test of the PowerWall.![]()
Everything's now in standby mode until the System Inspection and Utility Inspection are done. Could be a month or so for that.![]()
Guess I need a new bumper sticker:![]()
Didn't know the PowerWall had mood lighting!![]()
Permission to operate:![]()
-
2

14 Comments
Recommended Comments