First post says he was going to do 6 the first month for testing and then once they were satisfied they'd ramp up production to maybe 20 per month with Curt doing lots of hand soldering. If they sold 200 that would still take almost 10 months to get them all out. I mean damn, Perry moved two weeks ago but, he's already supposed to have another update on this thing like he's getting paid for it.
edit: lol, looks like Perry posted something while I was working on a post.