They're here.
Looks like the solar panels were designed in Germany.
9:30 south slope:
9:30 west slope:
9:30 north wall, the PowerWall is behind the orange ladder:
10:45 south slope
10:45 west slope
10:45 north wall
12:00 south slope
12:00 west slope
12:00 north wall
2:00 south slope - Panel installers finished and left.
2:00 west slope
2:00 north wall. CenterPoint (manages grid) is onsite, they had to pull the meter for the electricians.
4:20 south slope - I drug a ladder out so I could get a better photo of the south roof, was up against my neighbor's house for this shot. The original plan called for 6 rows with some gaps for vent pipes over the master bath. They were able to work around those and clean up the arrangement.
4:20 north wall - Electricians are finished, new sticker on the meter lets power company linemen know there's other sources of power besides the grid.
Test of the PowerWall.
Everything's now in standby mode until the System Inspection and Utility Inspection are done. Could be a month or so for that.
Guess I need a new bumper sticker:
Didn't know the PowerWall had mood lighting!
Permission to operate: