PCB orders
As of Monday the revision 10.0 board and the dongle board orders have been sent in. I don't know exactly how long it will take to get those boards back but I'm expecting a total turnaround time of about 3 weeks when you factor assembly and shipping into the mix. That means we have to try to make the most of things in the meantime. I have my repaired 9.2 board and the next step is to get the menu display up and running. I hope to report success on that front by Sunday evening.
I am really optimistic that the revision 10.0 board is going to be the last major revision. Delicon had a couple tweaks he was thinking of doing but unless there has been a major miscalculation, it shouldn't have to change much more. Then we can give much more attention on the firmware, the programming model, and the documentation.